Enter opens the highlighted result. Esc closes.

MiniMax-01 vs Morph V3 Large

MiniMax-01 costs 1.7x less per output token than Morph V3 Large ($1.10 vs $1.90 per million). Updated October 21, 2026; no benchmark has tested both models yet.

MiniMax-01MiniMax
Coding
No data
Overall
No data
Output $/M
$1.10
Morph V3 LargeMorph
Coding
No data
Overall
No data
Output $/M
$1.90
vs $1.10 vs $1.90 per 1M output tokens. MiniMax-01 is 1.7x cheaper.

MiniMax-01 or Morph V3 Large: which to pick

Neither model has a coding score yet, so the two cannot be ranked on coding.

Pick MiniMax-01 for output tokens 1.7x cheaper ($1.10 vs $1.90 per million) and a larger context window (1M against 262K tokens).

No benchmark has tested either model yet, so price and context are the only way to compare them.

Which one for your work

Each card is decided by one number both models carry. Where only one has it, the card says so and makes no call.

At a glance

Coding index
MiniMax-01 not benchmarked, Morph V3 Large not benchmarked.
Widest category
None yet: no category has been tested on both models.
Widest single gap
None yet: no benchmark has tested both models.
Output price
MiniMax-01 $1.10 against Morph V3 Large $1.90 per million output tokens, 1.7x apart.
Context window
MiniMax-01 takes 1M tokens, Morph V3 Large 262K.

Benchmark by benchmark

Every board either model has a result on, a category to a fold; bars are each result on a 0 to 100 scale. Only one model is measured on each, so no row names a leader.

What each workload costs

Three fixed token mixes at each model's listed price, so per-token rates become a bill.

Chat turn

1K input + 500 output tokens

MiniMax-01$0.0008Fits in one request
Morph V3 Large$0.0019Fits in one request

MiniMax-01 costs less

Repository review

50K input + 3K output tokens

MiniMax-01$0.013Fits in one request
Morph V3 Large$0.051Fits in one request

MiniMax-01 costs less

Agent loop

200K input + 10K output tokens

MiniMax-01$0.051Fits in one request
Morph V3 Large$0.199Fits in one request

MiniMax-01 costs less

Listed OpenRouter rates, without cache or batch discounts. A workload that does not fit a model's context window would need splitting.

Specification differences

The leading value in a row is marked; a row with a missing value names no leader. Our two rows are marked in red.

Specifications of MiniMax-01 and Morph V3 Large
SpecificationMiniMax-01Morph V3 Large
MakerMiniMaxMorph
WeightsOpen weightsNo public weights listed
ReleasedJanuary 15, 2025July 7, 2025
Context window1M262K
Input $/Mtok$0.20$0.90
Output $/Mtok$1.10$1.90
Coding indexNot benchmarkedNot benchmarked
Independent measurements behind it00
Cost per solved taskNot computableNot computable
SourceOpenRouter listingOpenRouter listing

Questions

Is MiniMax-01 better than Morph V3 Large for coding?

Neither model has a coding score yet, so the two cannot be ranked on coding. Pick MiniMax-01 for output tokens 1.7x cheaper ($1.10 vs $1.90 per million) and a larger context window (1M against 262K tokens).

Which is cheaper, MiniMax-01 or Morph V3 Large?

MiniMax-01 costs $0.20 per million input tokens and $1.10 per million output tokens; Morph V3 Large costs $0.90 and $1.90. Cost per solved task is known for neither of them.

Which has the bigger context window, MiniMax-01 or Morph V3 Large?

MiniMax-01, with 1M tokens against 262K.

Has any benchmark tested both MiniMax-01 and Morph V3 Large?

No benchmark has tested either model yet, so price and context are the only way to compare them. Data as of October 21, 2026.

Compare next